Profit
Monday
There was a flu epidemic at the weekend.
There were not enough workers for the 1st shift and so the shift
was cancelled.
The workers still get paid when off sick.
Only 1 batch was made today.
| Calculate the profit
(use the formula if you can: SP - BC - RC = P) |
Tuesday
There was only enough of one of the ingredients
in the stores to make the 1st batch, so more was bought in urgently
for the 2nd shift to make a batch.
Only 1 batch was made today.
The ingredient cost £200 extra.
| Calculate the profit
(use the formula if you can: SP - BC - RC = P) |
Wednesday
Demand was high today and so an extra shift
was called in to make an extra batch.
3 batches were made.
£200 overtime was paid to the 3rd shift.
| Calculate the profit
(use the formula if you can: SP - BC - RC = P) |
Thursday
The pump failed this morning and it cost
£150 to get it repaired.
Only 1 batch was made.
| Calculate the profit
(use the formula if you can: SP - BC - RC = P) |
Friday
2 batches were made today but both were
turned down by Quality Control.
The 2 batches were reduced to ½ price to sell them off.
| Calculate the profit
(use the formula if you can: SP - BC - RC = P) |
Saturday
Due to extra demand, the factory opened
today to run 2 overtime shifts.
2 batches were made and the shifts cost £200 extra each.
|
Calculate the profit (use the formula
if you can: SP - BC - RC = P)
|
|